Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online more than two weeks ago

Candidate

Male, 51 year, born on 28 April 1973

Moscow, willing to relocate (Australia, Brazil, Great Britain, Germany, India, Indonesia, Kazakhstan, Canada, Moscow, Netherlands, New Zealand, USA, Thailand, Ukraine, Finland, France, Switzerland, Sweden), prepared for business trips

Head of Innovations Development Department (Mining), Director R&D

Specializations:
  • Project manager

Employment: full time

Work schedule: full day

Work experience 29 years 5 months

September 2002currently
22 years 7 months
OJSC Scientific-Research Institute of Metallurgical Heat Engineering (OJSC VNIIMT). (Established in 1930).

Yekaterinburg, vniimt.ru

Educational Institutions... Show more

Innovation and strategic development director, Leading researcher, Project manager
Promote of the development of the institute. Negotiations. Technological and energy audit of metallurgical technology (various metallurgical furnaces, pumps, fans, aspiration, ventilation and air-conditioning systems etc.) for reducing electricity and fuel consumption, increase productivity. Engineering. Development of the project of modernization of technology and control systems, including the use of variable frequency drives for fan, pump control and aspiration system. Commissioning. The main projects and customers: Sokolov-Sarbai mining and processing industrial association, Rudny, Kazakhstan: Modernization of the traveling grate pelletizing plant № 5. Result: increase the productivity by 24.5 t/h (24.6%), reduce the natural-gas consumption by 56.3%(19.3 m3/t), and reduce fan power consumption by 9.9 kW-h/t (21.3%). (optimization: aspiration system, gas transfer system, gas cleaning system, burning systems etc). Oskolsky electro-metallurgical combine, Stary Oskol, Russia. Improving the productivity (by 40 %) of a Lurgi roasting machine. JSC Kachkanarskij Mining Plant. Development of technical and technological concept of the roasting machines modernization and automation of pellets production. Result: increase the productivity by 3%, reduce the natural-gas consumption by 31%, reduce fan power consumption by 13%. Development and implementation of energy efficient technologies in the metallurgy in order to reduce of electricity and fuel consumption, increased equipment productivity and product quality. The works include the optimization of ventilation systems, pumping units, draft installation (fans, exhausters), heaters etc. Project and customers: Sokolov-Sarbai mining and processing industrial association, Rudny, Kazakhstan: Modernization of the production line drying of iron ore concentrate in a rotary kiln (including: aspiration system, gas transfer system, gas cleaning system, burning systems, rotary kiln). Result: increase productivity by 20%, reducing fuel consumption by 10%. JSC Chelyabinsk Metallurgical Plant. Development of optimal control system for hot blast stoves. Result: reducing coke consumption by 1%.
December 2013April 2014
5 months
Technological University of the Ural Mining and Metallurgical Company.

Verkhnyaya Pyshma, tu-ugmk.com

Educational Institutions... Show more

Author and host training unique seminars: “Improving energy efficiency in metallurgical enterprises”
Author and host training unique seminars: “Improving energy efficiency in metallurgical enterprises”, including the modern theory and years of experience in the following areas: • thermo inspection metallurgical furnaces; • pump and fan systems optimization with use variable frequency drives; • efficient heating system; • efficient lighting systems; • energy efficiency compressed air systems; • ventilation and air conditioning systems; • optimization of electric motors working; • modern automated control system for process control. Audience: Chief Engineer, Chief Technical Officer, Chief Power Engineer, Head of IT etc.
June 2011January 2013
1 year 8 months
Ural Federal University

Yekaterinburg, ustu.ru/

Educational Institutions... Show more

Chairman of the State Examination Board (Commission)
Organization of the process of defense of graduation works of bachelors and masters Evaluation of the quality of graduation works of bachelors and masters
May 2004September 2006
2 years 5 months
Advanta Group, Ltd.

Yekaterinburg, www.advanta-group.ru

IT, System Integration, Internet... Show more

Executive Director
Managed sales and promotion of project portfolio management system Provided consulting services Conducted corporate trainings Negotiated with decision-makers at various levels, made presentations/ Responsible for staff management, financial reporting, cooperation with partners Worked with the largest enterprises of the Ural federal district at general director, chief engineer, director of IT levels - Bogoslovsky aluminium factory (SUAL), Chelyabinsk tube plant, Vysokogorsky and Kachkanarsky ore mining and processing enterprise (Evraz-holding), Metallurgical holding (Maxi-Group), Uralsky mining and metallurgical company and others.
December 2001May 2004
2 years 6 months
Sterling Group, Moscow, Ekaterinburg branch (one of top IT Russian companies)

Moscow

IT, System Integration, Internet... Show more

Project manager, Sale manager, Presale Direction: automation of iron ore pellets production and sintering. Projects management sector
- Made presentations and negotiated with customers in metallurgical and mining industry areas: Magnitogorsky metallurgical plant, Nigny-Tagilsky metallurgical plant, Tube metallurgical company, Uralsky mining and metallurgical company and others. - Developed of the business - plan of this direction, including: an evaluation of a potential seller's market, segmentation of the potential Customers; the description of positive peculiarities of an offered solution satisfying need of the potential Customers; the analysis of the competitors and their marketing policy; determination of channels of distribution and promoting; development of price policy etc. - Managed and tracked offers for the various enterprises, including MES-systems. - Nigny-Tagilsky metallurgical plant. Development of technical project «Automated control system of energy resources of metallurgical combine». - User of SAP ERP system (R3, CRM). - Project management system - MS Project.
September 2000November 2001
1 year 3 months
Triline Ltd., Ekaterinburg - one of top IT companies in Ekaterinburg.

Yekaterinburg, triline.ru

IT, System Integration, Internet... Show more

Programmer of automation systems in management and economy
Projects: Implantation of ERP system namely "Galaxy". Factory Russian Chromium 1915, Transport enterprise - Inspected business processes and information streams of the enterprise, document circulation. Developed implementation plan. Developed offers of reorganization of business processes and their automation. - commissioning (logistics, finance, accounts department, production) - Trained staff - Monitored projects, analyzed results
November 1995September 2000
4 years 11 months
«Torex», Ekaterinburg – science organization.

Yekaterinburg

Educational Institutions... Show more

Chief of development of optimal control system
Lebedinsky GOK (PCS7, more 1500 signal). Elaboration and commissioning optimal control system heat treatment iron ore pellets on the traveling grate pelletizing plant. Worked with Siemens AG. Have taken part in: offers development; presentation; engineering; commissioning; development of promotional materials.

About me

Good communication skills Initiative Ability to learn quickly Goals/objectives focused Ability to make decisions Motivation and Inspiration Customer focused Ability to establish relationships with customers

Higher education (Doctor of Science)

2012
Institute of metallurgy, Ural branch of the Russian academy of sciences. 2012.
Specialty: 05.16.02. Ferrous, non-ferrous and rare metals., Title of the thesis: Study and optimization of the heating systems in traveling grate furnaces and heat treatment parameters...
2010
Russian academy of Engineering Sciences
., Winner of the V.E. Groom-Grzhimailo prize (The great Russian heating engineer).
1998
Postgraduate study Ural State Technical University in 1995
Specialty: 05.13.16. Computers, mathematical modeling (simulation) and mathematical methods application in scientific researches, PhD. Title of the thesis: Development and application of mathematical models and algorithms for optimization...
1995
Ural State Technical University in 1995
Radio engineering department, Automation and control in engineering systems. System engineer. First class degree
1994
Certificated specialist in ERP system «Galaxy». Butkarev A.A. has more 50 publications in scientific journals. A lot of different courses in business development, project management, motivation and human resource management, marketing and sales.
_, _

Languages

RussianNative


EnglishC1 — Advanced


FrenchA1 — Basic


Citizenship, travel time to work

Citizenship: Russia

Permission to work: Russia

Desired travel time to work: Doesn't matter